Features
Schedule your production plan efficiently and reliably in just seconds.
Capacity Calculation
Material Driven Scheduling
Advanced Priority Management: Macro Rules
Optimized Finite Scheduling
Batch Operation Scheduling
Management of Overlapping Operations
Tool & Die Driven Scheduling
Scheduling with Operator Constraints
Scheduling with Mold Change Constraints
Automatic Machine Shutdown and Rescheduling
Real-Time Job Completion Percentage Tracking on Gantt
Non-Preemptive Operation Definitions
Inter-Operation Time Constraint Definitions
Scheduling with Alternative Route Definitions
Scheduling with Resource Constraints that Can Work Concurrently
Scheduling with Synchronized Start of Successive Operations
Scheduling with Queue Constraints
Scheduling with Shift-Start Assignment Constraints
Planning of Jobs By Automatic Division Into Batch Sizes
Job & Resource Relation Rules
Defining Flexible Rules with C# Script
Sequence Dependent Setup Definitions
Detailed Material & Tools Usage Analysis
Work Compression Tolerance
Forward - Backward Scheduling
Hybrid Optimization
Reducing In-Workshop WIP Stocks
Overtime Management
What-If Scenarios
OEE-Based Resource Workflow Optimization
Alternative Resource Migration with Rules or Capabilities
Visually Identify Production Bottlenecks
Resource Grouping & Load Balancing
Advanced Visual Filtering
Extensible Reporting
Integration
Machine / Die Maintenance Integration
HR Integration
Optimization Step by Step
Job Fixing
Bottleneck Job Fixing Module
Drag & Drop Scheduling
Extensible Dashboards
Audit of Operational Data Quality




